Randell 52365WPRM-CFA Manual do Operador Página 13

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 23
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 12
unifiedbrands.net 13
Preventive Maintenance
Randell strongly suggests a preventive maintenance program which would include
the following monthly, weekly, and daily procedures:
If a failure of the equipment is a direct result of any of the Preventative
Maintenance guidelines being neglected, the repairs and parts replacements will
not be covered under warranty.
It is recommended that the customer contact the local Authorized Service Agent to
provide a quote to perform periodic Preventative Maintenance.
Daily PM Procedures:
1. Clean upper lid hinge mechanism on a daily basis with a damp cloth containing
a solution of warm water and mild detergent to remove any debris that may
interfere with the hinge function.
Note: The upper lift mechanism must be cleaned while the lid is in the down
position. Do not lift the lid while cleaning.
Wipe along roller guide as well as the surface of the roller glides
Weekly PM Procedures:
2. Clean all gaskets on a weekly if not daily basis with a solution of warm water
and a mild detergent to extend gasket life.
3. Clean the grease filter on a weekly if not daily basis with either hot water, mild
detergent, or by cycling through a dishwasher.
Vista de página 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 22 23

Comentários a estes Manuais

Sem comentários