Randell 52365WPRM-CFA Manual do Operador Página 6

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 17
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 5
10
1010
10
800-621-8560
Unit Operation
UNIT INFORMATION
Mechanical Compartment
1. The breading station is supplied with a main power switch.
The switch is located on the rear of electrical box behind
the upper hinged vented door. The main power switch will
completely shut down the upper rail as well as the lower
refrigerated base.
2. The rail power switch is located on the front of the electrical
box. The rail power switch will shut down the rail for nightly
shut down and cleaning. The lower refrigerated base will
continue to cool when the rail power switch is off.
3. Two digital temperature controls are located on the front of
the electrical box. The upper control regulates temperature
for the rail and the lower control regulates temperature for
the refrigerated base. (See Unit Operation page 11).
4. The condenser filter indicator light is located on the front of
the electrical box. If illuminated the condenser filter must be
cleaned or replaced. (See Preventative Maintenance page
12).
5. The condenser filter is located behind the lower hinged
vented door. (See Preventative Maintenance page 12).
6. The drain valve for the upper rail is found behind the upper
hinged vented door. The rail may be drained by placing a
pan under the drain valve and opening the valve. (See
Evening Shut Down of Prep Rail).
Upper Rail Lid and Lift Mechanism
1. The lid can be positioned three ways
Fully closed
Opened
Fully opened
Note: All cleaning of rail lift mechanism must be done while lid is in closed position. The tension of the
lift mechanism has been pre-set at the factory.
Vista de página 5
1 2 3 4 5 6 7 8 9 10 11 ... 16 17

Comentários a estes Manuais

Sem comentários